Sunshine Canyon Landfill – USA

Project summary

Service provided:  Geotechnical instrumentation and monitoring solutions to control the construction of a stability buttress for a landfill in real-time
Location:  Los Angeles, California - USA
See google map
Client:  Sukut
Period of the service:  April 2018-April 2019
Sixense solutions used: 

Images of the project

The Sunshine Canyon Landfill

 

The Sunshine Canyon Landfill is a large landfill located in the Los Angeles neighborhood of Sylmar. It receives one-third of the daily waste produced by the city, and is owned by Republic Services. 

Sixense was tasked with monitoring excavation deformation during the construction of the CC 4-Stability Buttress project at the Sunshine Canyon Landfill (located within the south-central portion of the site straddling the city line).

 

The Sunshine Canyon Landfill Risks & Challenges

The purpose of the construction works was to create a stabilization buttress in an area on site that was susceptible to landslides and geologic instability prior to the development of the Sunshine Canyon Landfill. The buttress construction involved excavation into the geologically sensitive terrain composed of interbedded siltstone, sandstone, and claystone that had been fractured by now-inactive faults. Therefore, it was very important to all involved parties that the site was monitored appropriately and safely.

In addition, municipal solid waste landfills can introduce contaminants to the surrounding soil and groundwater if proper engineering controls and containment infrastructure are not in place. If these contaminants were not successfully contained, they could potentially impact groundwater quality and its use as a source of domestic water supply.

Other challenges included the solution being deployed in a difficult-to-access, changing construction site.

 

Monitoring Solution

To monitor for potential deformation of the stability buttress subgrade excavation, Sixense Northern America deployed a wireless, real-time monitoring solution created specifically for this job. The system that was supplied and installed featured the following:

  1. Cyclops (AMTS) to monitor a total of 27 monitoring prisms
  2. Wireless data loggers connected to existing piezometers to monitor groundwater pressure
  3. Inclinometers to monitor subsurface deflections
  4. Wireless tiltmeters to monitor foundation movement at discrete locations across the construction area
  5. An automatic weather station combining wind, rain, temperature, and barometric measurements

During this time, Sixense worked closely with the recommended geotechnical firm, Brierly Associates, at every stage of the monitoring program, including the installation phase, baseline period, and monitoring phase until the completion of the construction works. Sixense also coordinated with the project driller during the execution of each installation to ensure the work was completed smoothly.

 

Benefits of Sixense’s Monitoring Solutions

  • Enhanced environmental risk mitigation via real-time, long-range monitoring
  • Low installation and maintenance costs for most parts of the Sunshine Canyon Landfill
  • Decrease in failure risk from not having cabling that is typically prone to damage

 

Sixense was thrilled to assist with this project and allow the design and construction teams to progress confidently through each critical phase of the Sunshine Canyon Landfill. Throughout the duration, they remained committed to operating with beneficial policies for the customers, local businesses, residents, and the environment.

 

Click to Download the PDF

Project Key figures

1 AMTS Cyclops System
1 Automatic Weather Station
6 Shape Array
2 Tiltmeters

Similar projects