Our team provides you with support and advice on Jet-Grouting operations:
- For quick checking of column dimensions
- To ensure that only those quantities of material strictly necessary are used
- To optimise worksite costs and schedules
An exclusive solution developed by Sixense
The benefits of Cyljet
- Significant optimisation of operational costs:
Cyljet enables injection parameters to be calibrated to the highest-possible level of precision
- A robust and proven method:
Removes the need to excavate around columns to check the injection quality
- A quick solution:
Short implementation times and rapid availability of results (less than 48 hours after completion of measurements)
The principle of Cyljet
Cyljet enables in-situ dimensional checking of injection columns during construction.
The solution is based on the Electric Cylinder method, and provides 3D investigation around the full circumference of the column.
A multicore cable with evenly spaced electrodes is installed at the centre of the column to record and process the potential differences generated by the induced electric current to produce a 3D image of the injected column.
Cyljet can equally be used to validate a test plot, as well as provide continual checking of injection quality as work progresses.