Sixense supports construction, energy, and infrastructure stakeholders in the successful delivery of their projects across the African continent.
Thanks to our innovative monitoring solutions, recognized technical expertise, and strong local presence, we help secure and optimize even the most complex structures, from design to operation.
Discover four flagship projects showcasing our expertise
Cocody Bridge – Ivory Coast
The Alassane Ouattara Bridge, the country’s first cable-stayed bridge, was inaugurated in 2023 in Abidjan. In 2025, our teams carried out high-precision load testing, including leveling and vibration measurements on the stay cables. More than 50 configurations were tested, with measurement accuracy down to a tenth of a millimeter. All operations were conducted at night to ensure safety and maintain traffic flow.
M’Dez dam – Morocco
As part of Morocco’s national program to strengthen hydraulic infrastructure, Sixense deployed a comprehensive instrumentation system for real-time monitoring of internal deformations and pressures.
- 690 meters of fiber optic cable for automatic leak detection
- Deployment of hydraulic sensors, extensometers, and crack meters
- Centralized data management via Beyond Monitoring, our monitoring software platform
- A water injection system for calibration
This setup ensures automated, reliable, and secure dam operation.